Break out, cart away, correct the base, pour new. Taking the old slab out adds around $35 per square metre to whichever finish replaces it, and the crossing needs a fresh approval even when it goes back the same width.

+$35about $35 per m² on top of the new driveway

Single

36 m²

$4,680 to $5,940

$95 to $130 plus about $35 removal

Double

60 m²

$7,800 to $9,900

$95 to $130 plus about $35 removal

Double

60 m²

$9,900 to $13,200

$130 to $185 plus about $35 removal

The rates on this site are published so you can budget before anyone visits. Your price is the figure written on the quote once the site has been measured.


A driveway that has cracked through, dropped at the kerb or lifted at a joint is past patching. Grinding a trip hazard or filling a crack buys a season; pouring a new slab on top of a moving one copies the movement into the new concrete within a couple of winters. The honest fix is to take the old driveway out, find out why it failed, correct that, and pour once.

What removal costs

About $35 per square metre, added to the rate of the new driveway. A 60 m² double in plain concrete is therefore priced at $130 to $165 per square metre all up, or $7,800 to $9,900; the same driveway in exposed aggregate is $165 to $220 per square metre, or $9,900 to $13,200. The removal figure covers cutting, breaking, loading and tipping ordinary reinforced concrete of normal thickness. A slab poured thick, a driveway over a buried second slab, or a site the excavator cannot reach are quoted after the measure. The cost guide prices more combinations and the calculator has a removal switch.

What actually happens

  1. The slab is saw cut at the boundary, at the garage and at any concrete that stays, so the edges of what remains are clean.
  2. The concrete is broken up with a breaker or an excavator and loaded out. The mesh goes with it.
  3. The base underneath is inspected. This is the point of the exercise: a driveway that dropped usually sat on uncompacted fill or on clay that was never drained; a driveway that heaved usually had a tree root or a leaking pipe under it.
  4. The base is corrected, compacted and brought to level, with drainage added where water was the cause.
  5. The new driveway is poured to the specification: 100 mm of 25 MPa concrete inside the boundary on the corrected base, SL72 mesh on chairs, joints at no more than 3 metres, and the crossing to the council’s own thickness.

The crossing goes back through council

Replacing the crossing, boundary to kerb, is approved work in both council areas, even like for like. Lake Macquarie City Council is explicit that a replacement means a fresh application and a fresh fee. City of Newcastle’s Section 138 (Type 1) approval covers taking out or altering a driveway that joins a public road, not just building one. It is also the moment to fix a crossing that was too narrow or in the wrong place, because the approval is being sought anyway. The Section 138 guide covers both councils; note that Lake Macquarie reinstates any crossing it digs up in plain concrete only.

Replace or widen?

Often both. If the old driveway is coming out, the new one can be poured at the width a second car needs in one operation, with one base, one pour and one joint layout, rather than a strip added later. A plain or coloured replacement at the new width costs less than a replacement now and a widening later.

Old paths and patios

The same $35 per square metre applies to a cracked front path or a patio slab coming out ahead of the new work, priced with the paths, slabs and patios rates.

Have the whole job measured and quoted, removal and new pour on one sheet.

Asked before quoting

Asked before quoting driveway removal and replacement

How much does it cost to remove a concrete driveway in Newcastle?

About $35 per square metre on top of the new driveway rate, so removing a 60 m² double is around $2,100 before the new concrete. A replacement in plain concrete then runs $130 to $165 per square metre all up, and in exposed aggregate $165 to $220. Unusually thick or buried concrete is quoted after the measure.

Can a new driveway be poured over the old one?

It can, but it rarely should be. An overlay copies whatever moved the old slab, raises the level at the garage door and the kerb, and leaves the failed base in place. Where the old driveway is sound and only the surface is tired, a resurfacing is a different product; where it has cracked or dropped, removal and a fresh base is the repair that lasts.

Same size replacement. Is council approval still needed?

For the crossing, yes, in both council areas. Lake Macquarie wants a fresh Minor Public Works application and fee for a replacement, and Newcastle's Type 1 approval extends to taking out or altering a driveway that joins a public road. Your side of the boundary is your land and needs no road consent as a rule.

How long is the driveway out of action?

Typically the old driveway is out and the base corrected in a day, the new slab is poured on the next working day the crew and the truck are available, and cars stay off the new concrete for about a week. Plan for parking on the street for around ten days, longer if the crossing inspection sets the pour date.

Next